Engineering Company Asia WaterCo
Macro indicators of the country show the inappropriate situation of using resources such as water in the country. The poor condition of Iran’s water consumption indicators, demand growth and environmental pollution are among the most important factors that justify the need to pay attention to increasing the efficiency of water consumption in the country.
Company mission statement
In order to play an effective role in sustainable development through the production of potable and industrial water, in compliance with environmental standards, the task of desalination of water for drinking purposes in part of Hormozgan, Kerman and Yazd provinces as well as industrial and mineral uses of the companies Mes Sarchesheme is in charge of Gol Gohar and Chadormelo.
Asia Water Development Engineering Company, with research and strategic management (policy, implementation and monitoring) in the field of water production, is determined to satisfy its stakeholders, including a part of the citizens of Hormozgan, Kerman and Yazd provinces, the government and Sarcheshme copper companies, Gol Provide a full house and tent.
We believe that Ab Asia Water Company is a pioneering organization that will achieve its vision by trusting in God and relying on the three factors of modern technology, efficient human resources and an effective research and development system.
Statement of company values
we believe:
Human power is the most valuable asset of the company in the way of realizing the vision.
Special attention to human, Islamic dignity, responsibility and creativity of employees helps the company to achieve a dynamic and attractive environment.
The company will play a role by increasing energy efficiency and improving the quality of life of people and industry.
Asia Water Development Engineering Company is responsible for supplying and desalinizing Persian Gulf water in three phases as follows, using scientific innovations, management power and creative human resources:
zero phase:
Construction of facilities and provision of equipment needed to supply and desalinate water at the rate of one million cubic meters per day.
First phase :
Supply and desalination of Persian Gulf water at the rate of 550 thousand cubic meters per day.
Construction of the first phase of the power plant with a capacity of 250 MW
The second phase:
Capacity increase by 200 thousand cubic meters per day.
third phase:
Capacity increase by 250 thousand cubic meters per day
Construction of the second phase of the thermal power plant with the amount of 250 megawatts.
According to the prediction of the water crisis in the country, this company aims to fulfill its role by creating the largest desalination unit in Iran, a pioneer in the industry of fresh water production from sea water, using the maximum potential of domestic resources (human and equipment).
In this regard, Ab Asia Company has put the following activities on its agenda:
Phase zero (the project for the construction of facilities and the provision of auxiliary equipment needed for the supply and desalination of water at the rate of one million cubic meters per day) includes:
Construction of water catchment structure
Construction of sewage discharge structure
Carrying out site civil works, public buildings and electricity transmission required by the site
Construction of water storage tanks
The first phase (acquiring fresh water in the amount of 550 thousand cubic meters per day)
Construction of three desalination units in the form of two units with a capacity of 200,000 cubic meters per day and one unit with a capacity of 150,000 cubic meters per day.
Construction of the first phase of the power plant with a capacity of 250 MW
The second phase of development (capacity increase by 200 thousand cubic meters per day)
Construction of a desalination unit (with a capacity of 200,000 cubic meters per day)
The third phase of development (capacity increase by 250 thousand cubic meters per day)
Capacity increase by 250 thousand cubic meters per day
Construction of the second phase of the power plant and increasing the capacity up to 500 megawatts according to the needs